COURTYARD MODERNIZATION - DIAMOND BAR HIGH SCHOOL
Walnut Valley Unified School District modernized one of their high school recreational courtyards due to deterioration of an existing poured in place rubber system. The goal was to increase the courtyard's lifespan while improving aesthetics and addressing safety concerns
Method of Approach: KYA repaired and sealed the existing PIP system then overlaid synthetic turf ensuring a time-efficient and cost-effective method to avoid demolition. This method sustained the courtyard’s current ASTM safety rating with additional benefits of product longevity, high foot traffic and improved aesthetics
Results: This application resulted in a renewed and appealing courtyard for students to enjoy along with the advantage of a maintenance-friendly facility for the district, and all within budget.